1. The typical voltage level of the primary customer is

  •  66kV
  •  11kV
  •  400V
  •  None of the above


2. Which of the following is not the characteristic of the existing grid

  •  Manual Monitoring
  •  Failures and Blackouts
  •  Self-healing
  •  One way communication


3. In which of the following methods, the data and power both are transferred with the same conductor

  •  Fibre optic communications
  •  Cognitive radio
  •  Power line communication
  •  Cellular communication systems


4. Which of the following may not be a barrier in the smart grid technologies

  •  Lack of Infrastructure
  •  Lack of financial resources
  •  Lack of regulatory framework
  •  Integration of the grid with very small renewable generation


5. According to IRIG B, Time synchronization accuracy requirement is upto

  •  0.5 µs
  •  1 µs
  •  2µs
  •  0.1 µs


6. The boundaries of the customer domain typically consider which type of meters

  •  Energy Services Load
  •  Energy Services Interface
  •  Energy Services Demand
  •  Wattmeter


7. The transmission network is typically operated by

  •  Load Dispatch Centers
  •  Distribution Company
  •  Regional Load Dispatch Center
  •  Generation Company


8. Service Provider communicates with which domain?

  •  Bulk generation
  •  Distribution
  •  Transmission
  •  Customer


9. Energy Services Interface (ESI) communicates with other domain via:

  •  AMI infrastructure or Internet
  •  Home Area Network
  •  Local Area Network
  •  None of the above


10. In the following which standard represent the Practice for Interconnecting Distributed Resources with Electric Power Systems Distribution Secondary Networks.

  •  IEEE Standard 1547.3
  •  IEEE Standard 1547.4
  •  IEEE Standard 1547.5
  •  IEEE Standard 1547.6